GuideESG performance management: ESG data collection & automation
How to import electricity, gas, heat and fuel data automatically – from grid operator portals and invoices to sub-meters – and turn it into ESRS-ready energy figures.
easy4pro editorial team·Last reviewed: ·10 min read
Key takeaways
Energy data suits automation best: it arises regularly, is already digital at the grid operator or supplier, and drives most Scope 1 and 2 emissions.
Start with a meter list – metering point, site, energy carrier, unit, hierarchy and source. Without it, interfaces only automate errors.
Interval data (15-minute values) and a few sub-meters on the largest consumers show where energy is wasted, for example base load at weekends.
The revised ESRS ask for total energy consumption in MWh split into fossil, nuclear and renewable, calculated on final energy and net calorific value (ESRS E1-7, AR 18). Gas bills in kWh are usually on gross calorific value and need converting.
Under the Energy Efficiency Directive, companies above 85 TJ a year need a certified energy management system by 11 October 2027; above 10 TJ without one, an energy audit by 11 October 2026.
For most companies, energy is the most important environmental metric: it drives most Scope 1 and Scope 2 emissions and is a large cost item. Yet in many places meters are still read by hand and typed into spreadsheets – although the data is usually already digital at the grid operator, in the smart meter, on the supplier’s invoice or in the building management system.
This guide answers the practical questions: Where does energy data come from, and in what form? What has to be in place before you connect anything? Which checks catch the typical errors? What do the revised ESRS, the voluntary standard (VS) and the Energy Efficiency Directive expect? And how do you get from kilowatt-hours to emissions without counting anything twice?
Example (fictional)
A plastics processor in Upper Austria with 310 employees reads 14 meters every month and types the values into a spreadsheet. After the switch, electricity arrives as 15-minute values from the grid operator, gas from the supplier’s invoices and five new sub-meters on the largest consumers feed the software directly. The first week of interval data shows that compressed air keeps running at about 300 kW over the weekend, when nothing is produced – roughly 750 MWh a year, or 9% of the plant’s electricity. A timer and a leak survey follow within a month.
Where energy data comes from
Source
Typical data
Frequency
How to import
Grid operator (smart meter, portal)
Electricity; daily or 15-minute values depending on meter and settings
Daily
File export from the portal, sometimes an interface
Load profile meter (larger consumers)
15-minute electricity values
Continuous
File or interface from the grid operator
Supplier invoices
Electricity, gas, district heating, with period and tariff
Monthly or yearly
File import, invoice data from accounting, AI extraction from PDFs
Sub-meters, building management, energy monitoring
Consumption of individual equipment or areas
Continuous
Interface or scheduled export
On-site generation (PV inverter, CHP)
Generated and self-consumed energy
Continuous
Inverter or controller export
Fuel cards, heating oil and LPG deliveries
Diesel, petrol, heating oil, LPG
Per refuelling or delivery
Export from the card provider, delivery notes
Grid operator and supplier data usually covers 80–90% of consumption with little effort. Sub-meters add the detail you need to find savings.
The meter list first, then the technology
Before setting up any interface, build a complete meter list. Each meter needs:
metering point or meter number, and the site;
energy carrier and unit (kWh, MWh, m³, litres);
what it measures: whole site, building or single piece of equipment;
hierarchy: which sub-meters belong to which main meter, so nothing is counted twice;
source and frequency of the data, and an owner who answers questions about it.
The hierarchy is what makes the data trustworthy. You report the main meter; sub-meters explain it. The difference between the main meter and the sum of its sub-meters is “unallocated” consumption – worth watching, because a rising remainder often means a new consumer nobody metered or a leak.
A meter list as a hierarchy: the main meter is reported, the sub-meters explain it, and the remainder is tracked as unallocated consumption (fictional example).
What this means for you: if you do only one thing this quarter, build the meter list. It costs a few days, prevents the most common errors – forgotten meters, double-counted sub-meters and mixed units – and every later automation builds on it.
Interval data: seeing where energy goes
Monthly totals tell you how much; 15-minute values tell you when. Three patterns are worth looking for in the load profile:
Base load outside production hours: compressed air, cooling, ventilation or lighting that keeps running at night and at weekends.
Peaks: short spikes that drive grid charges, often from equipment starting at the same time.
Drift: a slowly rising base load that points to leaks, fouled heat exchangers or failing controls.
One week of interval data from the example: two-shift operation on weekdays and a weekend base load of about 300 kW from compressed air (fictional example).
Validation rules that work
Automated data is only useful if errors are caught automatically too. These checks cover most problems:
Detect gaps. If values for a day or month are missing, raise an alert instead of storing a silent zero.
Check jumps. Deviations above a set percentage against the previous month or the same month last year need a comment.
Reconcile totals. The sum of sub-meters may not exceed the main meter; track the remainder as unallocated consumption.
Reconcile meter against invoice. Compare meter data with invoiced quantities at least once a year.
Convert centrally. Units and calorific values are converted in one place, the same way for all sites.
What the revised ESRS and the VS ask for
Topic
Revised ESRS (CSRD reporters)
Voluntary standard (VS)
Disclosure
ESRS E1-7 Energy consumption and mix, if climate change is material
B3 Energy and greenhouse gas emissions (basic module)
Required figure
Total energy consumption of own operations in MWh, split into fossil, nuclear and renewable sources (paragraph 26)
Total energy consumption in MWh; voluntary for undertakings with 10 employees or fewer (paragraph 32)
Further breakdown
In high climate impact sectors: fossil consumption by coal, oil, natural gas, other fossil and purchased fossil electricity, heat, steam or cooling (paragraph 27); energy production split into renewable and non-renewable (paragraph 28)
Where the information is available: renewable and non-renewable electricity and fuels in a table
The calculation rules in ESRS E1, AR 18 are where most errors happen:
Final energy, net calorific value. Report the energy you actually consume, in MWh on lower heating value (net calorific value) for combustion. Gas invoices in Austria and Germany usually state kWh on gross calorific value; for natural gas the net value is roughly 90% of it. Use the factor your supplier states, document it and apply it centrally.
No double counting of self-generated energy. If you burn gas in a combined heat and power unit and use the electricity, count the fuel once – not the fuel and the electricity.
No offsetting. Energy you generate and sell to a third party does not reduce your consumption.
Feedstocks out. Fuels used as raw material, not burned for energy, are excluded (you may show them separately).
Renewable share, conservatively. State whether the renewable fraction of purchased electricity, heat or cooling is market-based or location-based. Market-based counts as renewable only where the contract clearly defines the attribute – a renewable power purchase agreement, a green tariff or guarantees of origin under the Renewable Energy Directive.
What this means for you: keep the raw unit from the source (kWh on gross calorific value, m³, litres) and the conversion factor next to each value. Converting at the source and discarding the original makes later checks – and assurance – much harder.
Energy Efficiency Directive: duties for larger consumers
above 85 TJ (about 23.6 GWh): a certified energy management system, for example under ISO 50001, by 11 October 2027;
above 10 TJ (about 2.8 GWh) without an energy management system: an energy audit by 11 October 2026 and at least every four years after that.
Both rely on reliable, ideally automatically captured consumption data. Member States transpose the details into national law, so check with your energy adviser how the obligations apply to you.
From energy data to emissions
With clean energy data most of the greenhouse gas inventory is done: fuels burned on site and in your own vehicles make up Scope 1, purchased electricity, heat, steam and cooling make up Scope 2. Two points need care:
Two Scope 2 figures. The GHG Protocol’s Scope 2 Guidance gives a location-based and a market-based result; the revised ESRS ask for both, the VS for location-based.
The same boundary. Energy and emissions should cover the same sites and the same periods, or the two figures will not reconcile.
Build the meter list. All meters and energy carriers per site, with unit, hierarchy, source and owner.
Connect the main sources. Grid operator portals and supplier invoices first; they cover most of the consumption.
Switch on validation rules. Gaps, jumps, totals and a yearly invoice reconciliation, before anyone relies on the numbers.
Add sub-meters selectively. On the largest consumers – compressed air, cooling, furnaces, ventilation.
Convert once. Net calorific value, renewable share and units handled centrally, with the factors documented.
Build energy KPIs. kWh per unit produced or per square metre, monthly per site, with target ranges. The guide on steering ESG KPIs all year shows how.
Common mistakes
Adding main meter and sub-meters: the classic double count.
Gas in gross instead of net calorific value: the ESRS figure ends up around 10% too high.
Silent zeros: a missing month imported as zero makes the year look better than it was.
Counting sold electricity as a reduction: energy sold to third parties does not offset consumption.
Renewable claims without contracts: a green share needs guarantees of origin, a renewable PPA or a defined green tariff.
Forgetting small sites: offices and warehouses with their own meters still belong in the total.
How ECOMON helps you capture energy data automatically
ECOMON brings meter, invoice and generation data together in one energy KPI structure.
Metrics, metric groups and KPIs: each meter or energy carrier is a metric; metric groups combine metrics with the same unit, and KPIs consolidate them per site and for the group.
No-code workflow automation: scheduled workflows import values from your existing tools and files – for example supplier invoices from Xero or logs in Google Sheets – and add them to the right metric, with notifications in Slack.
AI data extraction: values are extracted from uploaded files such as PDF invoices; a person reviews them before they count.
Values with evidence: every value has a date, an optional comment and attached files, so meter readings and invoices stay with the number.
Target ranges, benchmarks and alerts: monthly energy KPIs with target ranges, and notifications when a value leaves them.
Do we need smart meters to automate energy data?
No. Supplier invoices and grid operator portals already provide digital data. Smart meters and sub-meters add detail and speed, but the meter list and a regular import come first.
Which unit do the ESRS require?
Megawatt-hours (MWh), on final energy consumption and, for combustion, on net calorific value (ESRS E1, AR 18).
How do we convert gas from the invoice?
Gas invoices usually state kWh on gross calorific value. Convert to net calorific value with the factor your supplier provides – for natural gas roughly 0.9 – and document it.
Does on-site solar power count twice – as generation and as consumption?
No. Self-consumed solar power is counted once, as renewable consumption. Electricity you feed into the grid does not reduce your consumption.
Does the Energy Efficiency Directive apply to us?
It depends on your average annual energy consumption over the last three years: above 10 TJ, energy audits apply unless you run an energy management system; above 85 TJ, a certified energy management system is required by 11 October 2027. Check the national transposition.
How often should energy data be updated?
Monthly at least; daily or 15-minute data where available. Monthly figures are enough for reporting, but interval data is what reveals waste.
How to move ESG data collection from emailed spreadsheets to automated workflows – with clean data structures, validation rules, AI extraction and an audit trail.
How to set a credible climate target – boundary, base year, absolute or intensity, ambition – and track it monthly so you notice deviations while you can still act.
Why ESG metrics should be steered throughout the year, and how to set up the KPI structure, definitions, target ranges, benchmarks, owners and review rhythm.