Water stress at your sites: screening for ESRS E3 and adapting

Guide ESG performance management: Environmental KPIs

How to identify which of your sites are in areas with water stress under ESRS E3, document the result and reduce your sensitivity with efficiency measures.

easy4pro editorial team Last reviewed: 12 min read

Key takeaways

  • ESRS E3 AR 2 names four indicators for areas with water stress: baseline water stress, seasonal water depletion, baseline water depletion and WEI+. Each has a threshold.
  • Screen every site by its coordinates at river-basin level as a minimum – country averages hide stressed basins – and document indicator, threshold, dataset version and date for every site.
  • Check the seasons: a site can be fine on an annual average and heavily depleted in summer.
  • Global datasets mainly measure quantity. Add local knowledge on water quality, access, permits and past restrictions; ESRS allows tailored methodologies.
  • Screening shows exposure. Efficiency, reuse, storage and back-up sources reduce sensitivity, keeping output stable when restrictions hit less-prepared competitors.
Contents
  1. What counts as an area with water stress
  2. What you need before you start
  3. How to identify operations in areas with water stress: step by step
  4. Quick check: is this site in an area with water stress?
  5. Documenting the result
  6. Efficiency and adaptation: lowering your sensitivity to water stress
  7. Common mistakes in water-stress screening
  8. How FIESDA can help you report on water stress
  9. Frequently asked questions

Two plants can draw the same volume of water and still face very different futures. One sits in a basin where supply comfortably exceeds demand. The other sits where farms, cities and industry already compete for every cubic metre, and a dry summer can bring abstraction limits. Knowing which of your sites is which is the starting point for every water decision – and for ESRS E3 reporting.

This guide answers four practical questions:

  • What counts as an “area with water stress”?
  • Which data and tools do I need to check my sites?
  • How do I screen, classify and document each site so the result holds up in an audit?
  • Once I know where I am exposed, how do efficiency and adaptation measures reduce my sensitivity – and turn that into an economic advantage?

What counts as an area with water stress

Water stress describes how much pressure is put on the water available in a place. In ESRS E3 Water, it covers the quantity, quality and accessibility of water, and is one part of wider physical water-related risk, alongside floods and droughts.

ESRS E3 AR 2 gives four global indicators and thresholds. A site is in an area with water stress if it meets the threshold for the indicator you apply:

Indicator (data source) Threshold What it shows
Baseline water stress (WRI) “High” or above: 40–80% Share of available renewable water that is withdrawn each year
Water depletion (Brauman et al.) Above “High”: 25–75% (seasonal) Share of water consumed (not returned) in dry months – catches seasonal stress
Baseline water depletion (WRI) “High” or above: 50–75% Share of available water consumed over the year
Water Exploitation Index plus, WEI+ (EEA) 40% or above European measure of water use against renewable freshwater resources

What this means for you: AR 2 notes that these indicators mainly capture quantity. A complete assessment also looks at quality and accessibility – for example, polluted groundwater, or a supply that depends on a single pipeline or permit.

The four indicators and thresholds in ESRS E3 AR 2, and the tailored route for local evidence.
The four indicators and thresholds in ESRS E3 AR 2, and the tailored route for local evidence.

Terminology: the 2023 ESRS (Delegated Regulation (EU) 2023/2772) used “areas at water risk, including areas of high-water stress”, based on WRI Aqueduct baseline water stress only. The revised standard (Delegated Regulation (EU) 2026/1563) uses “areas with water stress” and a wider indicator set. If you screened under the old wording, re-run the screening. Online you will also see “water-stressed areas”, “high water stress” and “water scarcity” used loosely; in your documentation, name the indicators and thresholds you applied.

What you need before you start

Input Why you need it
Complete site list Every owned and leased production site, warehouse, office and data centre in your reporting boundary – use the same boundary as your climate risk assessment.
Exact coordinates Stress is assessed by basin. An address or country is not precise enough near basin borders.
Water source per site Public supply, groundwater, surface water, third-party or seawater. A municipal supply can draw on a stressed aquifer even if the site is in a city.
Withdrawal and discharge (m³) To prioritise: a stressed site with tiny withdrawal matters less than a stressed site with high consumption (withdrawal minus discharge).
Monthly profile To compare peak water use with the dry season.
Local documents Abstraction permits, past restrictions or curtailments, utility notices, river-basin management plans, groundwater and quality data.

Tools: the WRI Aqueduct Water Risk Atlas provides baseline water stress and baseline water depletion by basin; the EEA publishes WEI+ for European river basins; seasonal water depletion is based on Brauman et al. No single tool is mandatory.

How to identify operations in areas with water stress: step by step

ESRS sets the indicators and the basin-level minimum but no fixed procedure. The steps below follow those rules and leave a clear audit trail.

  1. Geocode every site. Collect latitude and longitude for each site in the list. Check sites near river-basin borders twice.
  2. Run the global screen. Enter the coordinates in Aqueduct and record baseline water stress and baseline water depletion with their categories. For European sites, add the WEI+ value of the river basin. Two sites in the same country can fall on opposite sides of the threshold.
  3. Check seasonal depletion. Record whether the basin exceeds the seasonal water depletion threshold, and in which months. Flag sites where peak production coincides with those months.
  4. Look at the actual water source. If a site buys water from a utility that draws on a stressed aquifer or reservoir elsewhere, the stress follows the source. Ask the utility where the water comes from.
  5. Add local knowledge on quality and access. Review permits, past curtailments, utility warnings, river-basin management plans, groundwater trends and quality issues. AR 2 allows tailored methodologies: you may classify a site as stressed even when global datasets do not – and you explain why.
  6. Classify each site. Mark it "with water stress" or "without". Decide in advance which rule applies – for example, any one indicator above its threshold, or local evidence of restrictions – and apply it consistently.
  7. Prioritise. Rank stressed sites by consumption and business importance (revenue, critical products, single-source production). These are the sites where water impacts, risks and opportunities are most likely to be material.
  8. Extend to key suppliers. Screen suppliers of water-intensive inputs (crops, textiles, chemicals, semiconductors) the same way. Much water exposure sits in the value chain, not at your own gates.
  9. Refresh. Re-screen annually, when you open or acquire sites, when datasets are updated, and after a drought year.
Example (fictional)

Nordquell Foods GmbH, a German beverage and dairy group with 1,400 employees, runs nine plants in Germany, Spain and Hungary. Screening by coordinates shows that its two Spanish plants lie in basins rated "High" for baseline water stress. One Hungarian plant is below "High" on the annual indicators but crosses the seasonal water depletion threshold in July and August – exactly when bottling peaks. A German plant scores low on every global indicator, but its groundwater permit was curtailed in two recent summers, so Nordquell classifies it as stressed under a tailored method and records the evidence. Result: four of nine plants are in areas with water stress, and together they account for over half of group water consumption. Those four become the focus of Nordquell's water policy, targets and investment.

The Nordquell example: four of nine plants are in areas with water stress, each for a documented reason.
The Nordquell example: four of nine plants are in areas with water stress, each for a documented reason.

Quick check: is this site in an area with water stress?

Question Answer
Baseline water stress at the site’s basin “High” (40–80%) or above? Yes → with water stress
Baseline water depletion “High” (50–75%) or above? Yes → with water stress
Seasonal water depletion above “High” (25–75%)? Yes → with water stress
European site: WEI+ of the river basin 40% or above? Yes → with water stress
None of the above, but local evidence of restrictions, depletion or quality problems? Consider “with water stress” under a tailored method; document why
None of the above and no local evidence? Without water stress – re-check next year

Documenting the result

Auditors and reviewers will ask how the site list was produced. For each site, keep:

  • the indicators applied, their values and categories, and the thresholds used;
  • the dataset and version, and the date of the screening;
  • any local evidence and the reasoning for a tailored classification;
  • screenshots or exports from the tools, and who reviewed the result.

Why it matters: under ESRS E3, the site list drives the consumption figure for areas with water stress (E3-4), any statement that stressed sites are not covered by your water policies (E3-1), and the actions and targets you set for those areas (E3-2, E3-3). Drought and low-river-level risks at the same sites feed the physical climate risk analysis under ESRS E1, so use one site list for both.

Efficiency and adaptation: lowering your sensitivity to water stress

Screening tells you where you are exposed. It does not tell you how badly a dry year will hurt. The damage depends on the hazard (drought, depletion), your exposure (a site in that basin) and your sensitivity (how much your operations depend on water that may be restricted). You cannot move a basin, and relocating a plant is rarely realistic. Sensitivity is the part you can change.

Measures that reduce sensitivity

  • Efficiency: metering and leak detection, dry or low-water cleaning, optimised cooling, and process redesign that lowers withdrawal per unit of output.
  • Reuse and recycling: closed-loop cooling, treated wastewater reused in processes, condensate recovery.
  • Storage and alternative sources: rainwater harvesting, on-site storage, and a second permitted source, so one restricted supply does not stop production.
  • Operational adaptation: shifting water-intensive production away from the driest months, contingency plans agreed with the utility and authorities, and supplier diversification for water-intensive inputs.
  • Basin cooperation: joint projects with other users and the water authority, which also reduce regulatory and reputational risk.

Why it pays: stability and competitive advantage

Water restrictions affect everyone in a basin at the same time. A plant that needs less water per unit, can draw on stored or recycled water, or has a back-up source can keep running at higher capacity while less-prepared competitors cut output. That means steadier revenues, fewer emergency costs, and a stronger position with customers who need reliable delivery during a dry season.

The costs at stake are rising. The OECD’s Global Drought Outlook (June 2025) estimates that the economic costs of droughts are increasing by 3–7.5% a year, that an average drought in 2035 will cost at least 35% more than today, and that every US$1 invested in drought prevention returns US$2–3 in benefits. CDP’s analysis of disclosures from more than 6,500 companies found that companies anticipate around US$397bn in financial impacts from water-related risks, while more than a third lack a process to assess and manage water risk. CDP’s head of water expects water resilience to become a competitive differentiator.

Dependency on water costs money even outside classic water-stress regions. In 2018, prolonged low water levels on the Rhine restricted raw-material shipments and cooling water at BASF’s Ludwigshafen site, and the company reported that this lowered its 2018 earnings by around €250m.

Policy points the same way. The European Water Resilience Strategy introduced a “water efficiency first” principle, and the Commission’s Recommendation on water efficiency sets an EU aim of at least 10% better water efficiency by 2030. It is not binding on companies, but it signals where permits, pricing and public funding are likely to go.

What this means for you: start with the stressed sites from your screening and quantify measures where you can – m³ saved, share of recycled water, days of storage. Re-screening shows whether exposure changed; these figures show whether sensitivity went down.

Common mistakes in water-stress screening

Mistake Better practice
Screening by country or region Screen by coordinates at basin level as a minimum.
Using annual averages only Check seasonal water depletion and compare with your peak-use months.
Looking only at the site location Check where purchased water actually comes from.
Treating global datasets as the full answer They mainly measure quantity; add local evidence on quality, access and restrictions.
Re-using a 2023 “water risk” list unchanged The revised indicators differ; re-run the screening.
Confusing water stress with all water risk Floods and droughts are wider physical risks; low river levels, for example, are analysed with climate risk (ESRS E1).
No documentation Record indicator, threshold, dataset version, date and reviewer for each site.
Screening own sites only Screen key suppliers of water-intensive inputs too.

How FIESDA can help you report on water stress

FIESDA is flexible ESG reporting software. Once your screening is done, it keeps the results and evidence together and helps you report them under ESRS E3: the ESRS template lists the water disclosures as data points with integrated guidance, so each figure has a place and an owner.

  • Store Aqueduct exports, permits and meter data in the Files of each reporting issue.
  • Let Assets summarise uploaded water studies and score their relevance by ESG topic.
  • Assign site owners and due dates on the dashboard.

You choose the screening method, tailor the template to your materiality results and review all AI output.

Illustration of an ESRS E3 reporting issue in FIESDA, with the screening exports, permits and meter data stored as files (example data).
Illustration of an ESRS E3 reporting issue in FIESDA, with the screening exports, permits and meter data stored as files (example data).

Frequently asked questions

What is an area with water stress under ESRS? An area that meets a threshold of the indicators in ESRS E3 AR 2 – for example “High” or above (40–80%) on WRI baseline water stress or 40% or above on the EEA’s WEI+ – assessed at least at basin level, or one identified through a tailored method using local knowledge.

Do I have to use WRI Aqueduct? No single tool is mandatory. AR 2 names WRI, Brauman et al. and EEA indicators and allows tailored methodologies. State which indicators, thresholds and data versions you used.

Is one indicator above its threshold enough? AR 2 lists the indicators as alternatives, so a site that meets any one threshold can be classified as in an area with water stress. Choose your rule in advance and apply it consistently.

What about offices and warehouses? Include them in the screening, then prioritise by water use. A low-use office in a stressed basin rarely drives material impacts, but it belongs in the list.

How often should we re-screen? At least annually, and whenever you add sites, datasets are updated or a drought year changes local conditions.

Should suppliers be screened too? Yes, for water-intensive inputs. Much water exposure sits in the value chain, and a stressed supplier can stop your production even if your own sites are fine.

Sources and legal basis

  1. Commission Delegated Regulation (EU) 2026/1563 (revised ESRS, incl. ESRS E3 Water)
  2. Commission Delegated Regulation (EU) 2023/2772 (ESRS, first set)
  3. Commission Recommendation (EU) 2025/1179 on water efficiency
  4. European Commission – Water Resilience Strategy actions tracker
  5. EFRAG Knowledge Hub – revised ESRS E3 Water
  6. WRI Aqueduct Water Risk Atlas
  7. Eco-Business: Water risks threaten trade as companies face US$397 billion exposure (CDP)
  8. BASF, Business & Financial News, 26 February 2019

Sources last checked on 20 November 2026.

This article is for general information only and does not replace legal, tax or audit advice.